The turnaround time for Armoloy Thin Dense Chrome (TDC®) and other coating types varies based on part geometry, coating specifications, and facility capacity.

Typical Lead Times:

  • Standard parts with simple geometry: ~5 business days
  • Moderate complexity or tight tolerances: 5–7 business days
  • Special cases (e.g., large parts, thick coating builds, regulated industries): 7+ business days

What Affects Turnaround:

  • Part Size & Shape: Larger or irregular components may require longer surface prep and fixturing
  • Coating Type: TDC, XADC, or hybrid coatings may require different bath times and post-treatments
  • Compliance Requirements: Aerospace, medical, and nuclear parts may require extra quality validation steps.